Chicago demolition permit · live public data

117 N JEFFERSON ST Chicago, IL

SELF-CERT 2019 CBC: INTERIOR DEMOLITION AND RENOVATION OF 3RD FLOOR OFFICE SPACE IN 3 STORY BRICK OFFICE BUILDING WITH BASEMENT, MERGING THREE OFFICE SUITES INTO ONE. STRUCTURAL REINFORCEMENT TO ROOF FRAMING FOR INSTALLATION OF NEW MECHANICAL DOAS AND VRF SYSTEM TO SERVICE 3RD FLOOR AND CONSTRUCTION OF NEW SHAFT FROM ROOF TO FIRST FLOOR (FOR FUTURE EXPANSION OF SYSTEM FOR ENTIRE BUILDING). NO CHANGE OF SQUARE FOOTAGE OR USE. (OCCUPANCY GROUP B, TYPE III A CONSTRUCTION)TOTAL AREA OF WORK: 10,082 SF

Salvage Signal36WATCH
Permit number101089795
Issue dateNovember 2, 2026
Reported scope$800,000
Listed public contactWILMOT, ADAM R

Why it surfaced

The public clues behind the score.

  • Multi-story structure
  • Large reported scope
  • Interior-only scope

Responsible next step

Verify with an authorized project party.

Ask whether material recovery, donation, salvage, or deconstruction is still open. Confirm ownership, permission, schedule, hazards, insurance, labor, and material condition before visiting or quoting.